Frontendandlinac我国建成RFQ射频功率源-Indico@IHEP.PPT

Frontendandlinac我国建成RFQ射频功率源-Indico@IHEP.PPT

  1. 1、本文档共32页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Frontendandlinac我国建成RFQ射频功率源-Indico@IHEP

DTL Mode saving and calling Phase scan√ Setting of RF parameters √ Online Lattice calculation Orbit measurement √ The measurement of transmission rate MEBTLRBTRTBT Mode saving and calling√ OnlineTwiss parameter calculation √ Online mode match The measurement of Twiss parameters The calculation of Twiss parameters at the entrance√ Orbit measurement and correction√ The application of BBA√ The data acquisition and fitting for wire scanner√ The setting of Buncher Debuncher parameters The planned list and done list AC mode Mode saving and calling, and online match√ The online display of power supplys√ COD measurement and correction √ The measurement of Twiss parameter tune Timing jitter measurement and correction The measurement of Fudge factor The dispersion measurement and correction The orbit response matrix measurement The beam measurement by ICA Beam collimation control√ RF parameters setting and display√ * survey-lattice-database-lattice √》 Injection, extractin and DC mode The measurement of injection beam height√ The chicane bump calculation and tuning√ Painting mode saving and calling√ The measurement of circumference √ COD measurement and correction√ Monitoring the drift of BPM data √ Online Twiss parameter calculation√ The measurement of Twiss parameter tune √ The measurement of Fudge factor √ The correction of Twiss parameter The measurement of Chromaticity √ The dispersion measurement and correction √ Online calculation tuning for extraction orbit √ Online match of extraction kickers √ The planned list and done list (cont’d) Thank you for your attention! * * * * * * * * * * * CSNS ATAC2012 CSNS ATAC2012 The Commissioning Plan and Preparation for CSNS Accelerators 王 生 for CSNS Accelerator Team Aug. 13, 2014, Lanzhou Outline A brief review of CSNS Accelerators The construction status of CSNS The commissioning schedule The commissioning for Linac The commissioning for RCS The development of application software * A brief review to CSNS CSNS

您可能关注的文档

文档评论(0)

zhaoxiaoj + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档