- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
FMEA介绍(绝经典版)
* Assessing Risk 2 Minutes Explain that when ratings have been assigned and entered into the severity, occurrence and detection columns, actions are then prioritized as follows: An effect of a Failure Mode with Severity rated 9 or 10 (YC Items) For all Severities of 9 or 10 the team must drive to root cause The ranking of the Severity times Occurrence ratings (criticality) results in a Failure Mode/first level Cause combination that is ranked higher relative to other combinations (YS Items) For all YS characteristics causes, root cause should be determined A Failure Mode/Cause/Design Control method combination has a higher RPN ranking than other combinations RPN values are used to rank risk order The RPNs have no value or meaning in themselves Explain that RPN = Severity x Occurrence x Detection It is an unsound practice to establish “threshold values” for RPN to characterize actions Each RPN value must be evaluated on its own * Recommended Actions Do not leave any fields in Recommended Actions blank Actions are required for all YC and YS items Explain that corrective actions should first be directed at the highest ranked concerns and critical items Stress that we are not interested specifically in increasing detection Aim for prevention! For each action, ask who does what and when for responsibility and completion date * Future Actions 2 Minutes Stress the need for taking actions with quantifiable benefits and following up all recommended actions A thorough Design FMEA will be of limited value without positive and effective actions to prevent failures Once the actions have been implemented, the estimated values, “the future,” becomes “the present” and can be incorporated into the left hand side of the form on the next FMEA The FMEA team leader must project manage the actions through to completion After action has been taken, enter a brief description of the action and its effective or actual completion date Re-rate any of the Severity, Occurrence or Detections
您可能关注的文档
最近下载
- 基坑支护内支撑梁拆除施工方案.docx VIP
- 最新人教版一年级上册《数学游戏》课件(整套)教学PPT(2024年秋-新教材).pptx VIP
- 最新人教版一年级数学上册《数学游戏》教学课件(整套)PPT(2024秋-新教材).pptx VIP
- GBT6058-2005 纤维缠绕压力容器制备和内压试验方法.pdf
- GB╱T 23711.1-2009 氟塑料衬里压力容器电火花试验方法.pdf
- 7m焦炉推焦车的结构特征.pdf
- 研发领料单模板.docx VIP
- 辽宁省技工学校审批表.doc VIP
- GB 26501--2011 氟塑料衬里压力容器 通用技术条件.pdf
- 施工放样报验单.doc VIP
文档评论(0)