- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
第8部分:配网工程
消防、防火、防小动物封堵作业指导书编码:PDFTJ-19
PDFTJ-19消防、防火、防小动物封堵 作 业 指 导 书
中国南
中国南方电网有限责任公司电网建设施工作业指导书 第 8 部分:配网工程
目次
1适用范围······················································································································································639
2编写依据······················································································································································639
3作业流程图··················································································································································639
4安全风险辨析与预控··································································································································639
5作业准备························································································································································13
6作业方法··························································································································································6
7质量控制措施及检验标准······························································································································9
1适用范围
本节适用于35kV及以下配网工程配电房内的消防、防火、防小动物封堵安装。
2编写依据
表2编写依据
序号
引用资料名称
1
GB50140—2005《建筑灭火器配置设计规范》
2
Q/CSG11105—2008《南方电网工程施工工艺控制规范》
3
《中国南方电网有限责任公司基建工程质量控制作业标准(WHS)》
4
上级单位配网验收相关标准及文件
?3作业流程图
图3-1灭火器安装作业流程图图3-2封堵工程施工作业流程图
4安全风险辨析与预控
4.1消防、防火、防小动物封堵作业前,施工项目部根据该项目作业任务、施工条件,参照《电网建设施工安全基准风险指南》(下简称《指南》)开展针对性安全风险评估工作,形成该任务的风险分析表。
4.2按《指南》中与消防、防火、防小动物封堵作业相关联的《电网建设安全施工作业票》(编码:
PDFTJ-19-01/01),结合现场实际情况进行差异化分析,确定风险等级,现场技术员填写安全施工作业票,安全员审核,施工负责人签发。
4.3施工负责人核对风险控制措施,并在日站班会上对全体作业人员进行安全交底,接受交底的作业人员负责将安全措施落实到各作业任务和步骤中。
4.4安全施工作业票由施工负责人现场持有,工作内容、地点不变时可连续使用10天,超过10天须重新办理作业票,在工作完成后上交项目部保存备查。
表4.1作业任务安全基准风险指南
序号
危害名称
风险种类
风险等级
风险控制措施
1
灭火器定位放线安装时,冲击钻电缆线破损或漏电
触电
高风险
加强使用前及使用过程中的检查,保护零线与工作零线不得混接,开关箱、漏电保护器灵敏可靠,漏电保护器参数应匹配,严格执行“一机、一闸、一漏、一箱”的要求
2
灭火器定位放线安装时,工器具操作不当
碰撞打击
可接受的风险
加强防范保持距离
3
脚手架未经检查验收就投入使用
坍塌坠落
低风险
脚手架搭设完成后,必须经
文档评论(0)