木骨架罩面板顶棚安装施工工艺(9013-1996)(construction process of ceiling installation of wood skeleton panel (9013到-1996)).docVIP

木骨架罩面板顶棚安装施工工艺(9013-1996)(construction process of ceiling installation of wood skeleton panel (9013到-1996)).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
木骨架罩面板顶棚安装施工工艺(9013-1996)(construction process of ceiling installation of wood skeleton panel (9013到-1996))

木骨架罩面板顶棚安装施工工艺(9013-1996)(Construction process of ceiling installation of wood skeleton panel (9013-1996)) Wooden skeleton cover panel ceiling installation process (9013-1996).Txt, my life has A noodles, also has B noodles, your life has S noodles, also has B noodles. Failure is not terrible, the key is to see the success of his mother. Todays college students are too lacking in quality! Come over and get the wool and cut it! Have the time to learn Feng Shui, after the death of a good tomb, but also make up for the lifetime can not afford to buy a good room regret. The process standard applies to industrial and civil buildings, ceiling using wooden skeleton, installation of various types of panels ceiling installation works. 2.1 materials: 2.1.1 wood: wood skeleton must be dry, red without distortion. The white pine trees, and fire in accordance with the design requirements; the use of yellow pine. Water keel specifications according to individual design requirements, such as the design does not specify, the big keel specifications for 50mm x 70mm or 50mm * 100mm; small keel specifications for 50mm x 50mm or 40mm * 60MM; suspender specifications for 50mm * 50mm or 40mm * 40mm. 2.1.2 cover board and batten: according to the design selection, strictly grasp the material and specifications. 2.l.3 other materials: round nails, phi 6 or Phi 8 bolts, bolts, expansion bolts, adhesives, wood preservatives and galvanized wire No. 8 (Qian Si). 2.2 main machines and tools: 2.2.1 machinery: small electric saw, small planer. 2.2.2 power tools: hand drill. 2.2.3 hand tools: wood planing, planing, planing, and slot line saw, ax, hammer, screwdriver, drill etc.. 2.3 operating conditions: 2.3.1 cast-in-situ reinforced concrete slab or precast floor slab, according to the design of embedded ceiling fixture, if there is no design requirement, can be embedded with 6 or 8 bar spacing is about 1000mm. 2.3.2 wall masonry, should be based on the ceiling, buried in the wall around the pre f

您可能关注的文档

文档评论(0)

189****6821 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档