关于桥梁施工外文翻译.docxVIP

  • 7
  • 0
  • 约1.41万字
  • 约 9页
  • 2019-04-18 发布于浙江
  • 举报
Hydration heat of mass concrete in the bridge and cracks In recent years, large-scale bridge construction increasing number requires some suspension bridge anchorages and bridge pile cap due to the construction, infrastructure using the geometric dimensions of the design, the concrete construction of its huge volume of $ 10,000 to tens of thousands of cubic meters, compared with reinforced concrete, its structure is thick, concrete volume, complex engineering conditions (usually cast mostly underground or semi-underground building) construction technology requires high heat

文档评论(0)

1亿VIP精品文档

相关文档