船舶专业外文文献.docVIP

  • 18
  • 0
  • 约4.74万字
  • 约 19页
  • 2019-05-18 发布于安徽
  • 举报
专业资料 word完美格式 Spatial scheduling for large assembly blocks in shipbuilding Abstract: This paper addresses the spatial scheduling problem (SPP) for large assembly blocks, which arises in a shipyard assembly shop. The spatial scheduling problem is to schedule a set of jobs, of which each requires its physical space in a restricted space. This problem is complicated because both the scheduling of assemblies with different due dates and earliest starting times and the spatial allocation of blocks with different sizes and loads must be considered simultane

文档评论(0)

1亿VIP精品文档

相关文档