网站大量收购独家精品文档,联系QQ:2885784924

HND国际实物配送2.doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
1Transportation modes Mode Total mode cost Cost per pallet Transit time Advantages Disadvantages Sea 620 24.8 7days Cheap and large capacity Slow and high risks Air 1265 253 4hours Fast and secure Expensive and finite capacity Rail 1275 51 2days Fast and large capacity Less flexible and need railroad Direct road 1350 67.5 3days Better for shipped and convenient Small capacity and expensive Multi-mode 1185 47.4 7 days 18 hours Reduce handing of cargo and quicker transit times Cost of investment is high Take sea as an example, because the shipping requires 25 pallets and the total cost is 620, the cost per pallet is 620/25=24.8. In the similar way, other result also can be calculated, except the Multi-mode. The Multi-mode’ cost is 1185 including 125, 620, 295, and145, thus the cost per pallet is 1185/25=47.4. Air transportation is optimum choice. Air transportation can use the least time to convey goods due to faster speed. Besides, it also ensures the security to a large extent relatively. However, it also has some disadvantages. Air transportation has expensive cost, and airport is distant from municipal center. Sea transportation also can be chosen. Though it is the slowest method and vulnerable to bad weather in ocean, it is the lowest expenses of freight and carries the largest quantities. Angus Glen also can select rail. Rail has a large capacity and is less refrained by bad weather. Rail has these disadvantages, it is not much flexible and can not work without railroad. 2 Consignment delivery term FCA Free Carrier (named place of delivery) A trade term requiring the seller to deliver goods named airport, terminal, or other place where carrier operates. Cost loss transfer buyer and risk of loss transfer to the buyer after deliver to the carriers. The seller fulfils his obligation deliver when he has handed goods over, cleared for export, into the charge of the carrier named named by the buyer at the named place. When used trade terms,

文档评论(0)

181****1752 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档