汽车厂锅炉给煤装置改造技术案例.docVIP

  • 1
  • 0
  • 约4.4千字
  • 约 8页
  • 2019-06-15 发布于湖北
  • 举报
PAGE PAGE 6 案例名称 客车公司锅炉给煤装置改造 Renovation of Coal-feeding Device of Boiler in Shenyang Jinbei Coach Corporation 案例摘要 本案例是将1台4吨/时正转链条炉排蒸汽锅炉的煤斗,用分层给煤装置替代。项目投资10万元,实现年节标准煤285吨,年减排二氧化碳203吨碳,减排二氧化硫5吨、总悬浮颗粒物4吨。年节能效益11.4万元,项目简单投资回收期0.88年。 This case is to replace coal scuttles of one 4t/h forward-turning chain grate steam boiler with layered coal-feeding device. The investment of the project is RMB 100 thousand. After renovation, it obtains annual energy saving capacity of 285 tce. The capacity to mitigate CO2, SO2 and TSP emission is 203 tc, 5 tons and 4 tons respectively per year. Annual energy sa

文档评论(0)

1亿VIP精品文档

相关文档