- 1
- 0
- 约6.35千字
- 约 58页
- 2019-09-01 发布于湖北
- 举报
1
Chapter 8 Transportation and metering of Fluids
2
Content
8.1 PIPE, FITTINGS, AND VALVES
8.2 PUMPS
8.3 Centrifugal Pumps***
8.4 FANS, BLOWERS, AND COMPRESSORS
8.5 MEASUREMENT OF FLOWING FLUIDS
3
8.1 PIPE, FITTINGS, AND VALVES
1. Pipe and tubing
2. Joints and fittings
3. Allowances for expansion膨胀余量
4. Prevention of leakage around moving parts
5. Valves
6. Recommended practice
4
1. Pipe and tubing
Pipe: heavy –walled and large diameter and comes in moderate lengths.
Tubing: thin –walled and coils
5
(a) Material
Pipe and tubing can be made from:
Metals and alloys: low –carbon s
您可能关注的文档
最近下载
- 中医护理技能竞赛评标准中医护理技能竞赛评分标准.doc VIP
- 全过程工程咨询服务费取费标准(年最新版).pdf VIP
- 2025甘肃酒泉市市直部门单位遴选(选调)45人备考题库附答案.docx VIP
- 借款用途合同范本.docx VIP
- IEC 61000-4-2标准中文版文档.docx VIP
- 2025中国绿发集团第一批次社会招聘68人参考题库附答案解析.docx VIP
- 全市中医药系统中医护理岗位技能竞赛题库.docx VIP
- 初中数学公式定理大全.pdf VIP
- 2025中国绿发集团第三批次社会招聘笔试参考题库附答案解析.docx VIP
- 12J304 楼地面建筑构造.docx VIP
原创力文档

文档评论(0)