- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
沉井施工针对地下建筑物如何实现完美升级
沉井作为一种深基础在市政工程中较为常见,沉井基础有效的解决了基础体积大、埋置深、特别是复杂地质条件(软弱地层、富含水层、承压水地层等)下施工问题。沉井施工使得支护和构筑物的建造能够一次完成,这样就达到了较好的技术、经济效果。
Caisson as a deep foundation is more common in the municipal engineering, open caisson foundation effectively solves the problem of the foundation of large volume, buried deep, especially in complex geological conditions (soft stratum, is rich in water, confined water layer under construction). Open caisson construction makes the supporting construction of retaining structures and can finish in one time, so as to achieve better technical, economic effect.
沉井就是在垂直方向上,将各种形状的井筒(沉井)边排土边沉入地下,最后固定在地层中,形成地下建筑物或构筑物的施工技术。沉井在地面上制作,施工条件比地下好,可以做成界面尺寸、刚度大,承载力高,耐久性好,内部空间可有效利用的构件,适合各种使用条件。制作好的沉井通过下沉穿越到预定位置,能适应各种复杂的地址条件,如淤泥、流沙、坚硬土层等。沉井结构本身可兼做下沉中的维护掩体,安全、经济;开挖不需放坡,不需专门的维护结构,挖土量少,对周围环境的影响小。
Open caisson is in the vertical direction, various shapes of wellbore (caisson) side dumping side sink into the earth, finally fixed in the stratum, forming underground buildings or structures and construction technology. Open caisson in the ground, the construction conditions than the underground well, can be made into interface size, high rigidity, high bearing capacity, good durability, components of internal space can be used effectively, is suitable for various conditions of use. Make a good open caisson by sinking through to a predetermined position, can adapt to various complex conditions such as address, silt, sand, hard soil layer. Open caisson structure itself can be used as the sinking maintenance shelter, security, economy is not required; excavation slope, no need of maintenance structure is special, excavation quantity is little, the impact on the surrounding environment of small.
施工现场准备工作主要是施工现场的障碍物清理。在障碍物处理之前,首先要调查清楚地上建筑物,地下构筑物、管道、电缆等建造和铺设情况,然后确定要清除及保护的对象和应采取的措施。
Construction site preparation work is the main obstacle in the construction site clean-up. Before the barrier treatment, first of all to clear investigation on buildings, fabric, pipe, cab
您可能关注的文档
最近下载
- 高考化学《原子坐标的确定》复习课件.ppt VIP
- 高考语文专题复习 曹禺《雷雨》 专项练习题汇编(含答案解析).pdf VIP
- 【直接打印】部编版七年级上册历史期末必背知识点复习提纲(全面!).doc VIP
- 战斗机幼儿课件.pptx VIP
- 国开电大 人力资源管理课程学习心得.docx VIP
- NB-SH-T0387-2023钢丝绳用润滑剂.pdf VIP
- 工作危害分析JHA危害识别表.xls VIP
- 石油化工行业检修工程预算定额传动设备预算定额.pdf VIP
- 博饼规则(含图及奖品分布).xls VIP
- 2018款上汽通用别克Velite5_汽车使用手册用户操作图解驾驶车主车辆说明书电子版.pdf
文档评论(0)