OUTLINE OF DOCKING TEST(MACHINERY PART)
SC4475-946-02SY
共 NUMPAGES 23 页
第 PAGE 3 页
PAGE 28
BUILDER
NEW YANGZI SHIPBUILDING CO., LTD
SHIP’S No.
YZJ2006-757….
DESIGNER
SHANGHAI MERCHANT SHIP DESIGN RESEARCH INSTITUTE, CSSC
92500t Bulk Carrier
DETAIL DESIGN
标记
数量
修改单号
签 字
日期
OUTLINE OF DOCKING TEST (MACHINERY PART)
SC4475-946-02SY
编制
描打
校对
描校
审核
总面积
m2
共 23 页
第 PAGE 1 页
标检
SDARI
审定
日期
‘
目 录
TOC \o 1-1 1 General 3
2 Main Engine and Shafting 3
3 Diesel Generator Sets 4
4 Emergency Generator Set 6
5 Compo. Boiler 7
6 Air Compressors and Air Reservoirs 8
7 F.O. purifiers and L.O. purifiers 10
8 M/E , G/E boost unit 10
9 L.O. auto filter 10
10 Sewage treatment unit 10
11 Incinerator 11
12 Quick Closing Valve 11
13 Bilge and Ballast System 12
14 Workshop Equipment 12
15 E/R Crane 13
16 Auto. Stand-by of Pumps 13
17 Test of Temperature Control Valves 14
18 Test of alarm device for various tanks 14
19 Test of Piping System 16
20 CO2 Fire Extinguishing System 17
21 Remote Gauging System 17
22 Mechanical Ventilation System (Including E/R cabin) 18
23 Test Regulations for Refrigerating System 18
24 Test Regulations for Air Conditioning system 21
25 M/E maneuvering test 23
General
Allowable error of settings
Allowable error of pressure setting value: ?2.5%
Allowable error of temperature setting value: ?3℃ if 100℃ and ?5℃
Allowable error of liquid level setting value: ?5%
Particular stipulation on allowable error should be complied with if any.
Safe alarm test must use drawing (SC4475-440-01MX) as reference procedure during test.
Take consideration of the service engineer’s comments if there is any.
Main Engine and Shafting
Inspection items before start of M/E
Measure insulation resistance (cold condition) of the electrical box motor of turning gear.
Check the reliability of interlock device for turning gear, the main engine can not be started when the turning gear is engaging..
Run the auxiliary machinery, systems served fo
您可能关注的文档
最近下载
- americanculture小学英语美国文化专题.pptx VIP
- 中国珠宝首饰传统文化 夏商周 中国古代夏商周(商)首饰种类2.pptx VIP
- 大学生科技创新课程之中美青年创客大赛(西南交通大学)中国大学MOOC 慕课 章节测验 期末考试答案.docx VIP
- 中国珠宝首饰传统文化 夏商周 中国古代夏商周(夏)首饰种类1.pptx VIP
- 【课程思政案例】《机械设计基础》.docx VIP
- 2025中级注册安全工程师《安全生产技术基础》考前密训10页纸.docx VIP
- 科研伦理与学术规范期末考试答案.docx VIP
- 检验科重点专科汇报.pptx VIP
- 重大社2024《财务实训教程—智能财务共享》教学课件-费用共享.pptx VIP
- AmericanCulture.ppt VIP
文档评论(0)