- 13
- 0
- 约1.17万字
- 约 108页
- 2019-10-11 发布于江西
- 举报
纤维增强嵌体冠桥 * Initial Situation. * The pillars were prepared: occlusally 2 mm, other sides 1.5 mm; space should be created for the fibreframe, to obtain sufficient strength and thickness. Curved surface pillars were made. * Technicians made a Stick fibre frame. And from Stick?Net, a separate crown frame for each pillar. These were joined together with Stick?, both occlusally and linqually. * A closer view of the fibre frame. * Note! The fibres in the crown frames should be visible on the attachment surface, to obtain the best possible join between the bridge and teeth. The attachment surf
您可能关注的文档
最近下载
- 《轻钢龙骨石膏板隔墙工艺工法图集》12-10修改(汇总1).pdf VIP
- 【深信服】安全PT1-AC认证必备考试题库(附答案).docx VIP
- (入党志愿书空白表格.doc VIP
- 2025年凉山西昌市辅警考试公安基础知识考试真题库及参考答案.docx VIP
- 实验室安全手册.pdf VIP
- 精品解析:2022-2023学年北京市西城区人教版四年级下册期末考试数学试卷(原卷版).docx VIP
- 《农作物生产技术》课程标准.docx VIP
- 背手上铐及搜身带离课件.pptx VIP
- 京东集团市场营销部面试题集.docx VIP
- T_TMHIA 005-2022 天津市城镇排水管道检测与评估技术规程.docx
原创力文档

文档评论(0)