- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
THE METHOD STATEMENT OF SCAFFOLD FOR PIPE RACK
Contract No.
EPC-LS-12-HADEED-003-IK
Project
Name
HADEED DR MODULE D
DEBOTTLENECKING (DBN) PROJECT
PAGE 22
CHINA CHEMICAL 11TH CONSTRUCTION COMPANY (K.S.A.)
HADEED DR MODULE D DEBOTTLENECKING (DBN) PROJECT
THE METHOD STATEMENT OF SCAFFOLD FOR PIPE RACK
ELECO-11071-DBN-TJ-FA-
A
2 Dec 2013
ISSUED FOR REVIEW
REV
DATE
DESCRIPTION
PREPD
(ELECO)
CHKD
(ELECO)
APPD
(ELECO)
WISON
Content
TOC \o 1-1 \h \z \u
1. Introduction 3
2. Scope of Work 3
3. Manage Guidelines 3
4. Applicable Regulations and Standards 4
5. Man Power and Materials Supply 4
6. Scaffolding Material Standards 5
7. General Erection Methods 5
8. Special Erection Methods for Pipe Rack (New PR included) 7
9 Inspection 20
10 Scaffold tagging system 21
11 Modifications 21
12 Hazards 21
13 Safety Signs and Barriers 22
14 Precautions during Construction and Dismantling 22
15 Competence and Training 22
Introduction
The purpose of this document is to describe the working methodology for erection, modification and dismantling of scaffolding works in pipe rack area (new pipe rack included).
Scope of Work
In DBN project, pipes and cable trays will be placed on steel structures whose elevation is 7.1m and 9.1m respectively. The total length of all scaffolding extends to 700m or so. And the scaffolds shall meet working demand of erecting, welding, painting coating of the pipeline. Considering such situations, Tower Scaffolding, Hanging Scaffolding, and Cantilever Scaffolding are applicable.
Manage Guidelines
SCAFFOLDING CONSTRUCTION (SC) shall mandatorily:
a) Prior to commencement of any activity, all personnel involved in scaffolding works shall attend the project HSE induction.
b) The site management, supervisors and safety officers will closely monitor all plashes of scaffolding activities in connection with compliance of safe working methods, daily tool box meetings.
c) Ensure that all scaffolders are third p
您可能关注的文档
最近下载
- 2025年北京市中考道法真题卷含答案解析 .pdf
- F-DZW智能型电动执行机构说明书.pdf
- 江苏省南京市2026届高三上学期9月学情调研试题 地理试卷含答案.docx VIP
- 信息技术-脑机接口行业深度报告:脑机接口,未来正在到来.docx VIP
- 成立婚介公司商业可行性研究报告.docx VIP
- 最新重庆中考英语答题卡模板.docx VIP
- 2025至2030中国婚介网站行业发展趋势与产业运行态势及投资规划深度研究报告.docx VIP
- 重庆中考英语答题卡模板.docx VIP
- 战舰与海战(中国人民解放军海军指挥学院)网课期末考试答案.pdf
- 浙教版九年级上册科学 第1章 物质及其变化 单元测试卷(含解析).pdf VIP
文档评论(0)