佛山水道一河两岸景观规划与城市设计2011-03-02知识分享.ppt

佛山水道一河两岸景观规划与城市设计2011-03-02知识分享.ppt

Foshan River Conceptual Plan;;;;;;;;;;;;Existing Levee: Mean Daily Tide;Existing Levee: Flood;Existing Levee: Mean Daily Tide + Flood;Proposed Design: Mean Daily Tide;Proposed Design: Flood;Proposed Design: Mean Daily Tide + Flood;Existing Levee + Proposed Design: Flood;Daily Low Tide: Zhuji -1.0 M / 85 Datum -0.263 M;Daily Median Tide: Zhuji 0.0 M / 85 Datum 0.737 M;Daily High Tide: Zhuji 0.8 M / 85 Datum 1.537 M;Extreme Flood Level: Zhuji 3.5 M / 85 Datum 4.237 M;Daily Low Tide: Zhuji -1.0 M / 85 Datum -0.263 M;Daily Median Tide: Zhuji 0.0 M / 85 Datum 0.

文档评论(0)

1亿VIP精品文档

相关文档