Indonesia
Indonesia PBA Gas Treatment Project
PBA Gas Treatment Plant
Construction management planning
The tenth construction company of Sinopec
Indonesia Gas Treatment Project Department
September,2005
Indonesia
Indonesia PBA Gas Treatment Project
PBA Gas Treatment Plant
Construction management planning
Compiled by: Indonesia PBA Gas Treatment Project Department of the tenth construction company of Sinopec
approved by: Shengli engineering and consulting Ltd. Company
Veritified by:
Approved by:
Approval date:
Indonesia
Indonesia PBA Gas Treatment Project
PBA Gas Treatment Plant
Construction management planning
Compiler:赵恩广 于建涛 曹建兵 刘军
Approved by:孙茂功
Approval date:September 27, 2005
Catalog
1Compilation Explanation1
1.1 background and meaning of the project1
1.2 organization relationship1
1.3 reference1
1.4 principle2
1.5 guideline2
2 Brief Description3
2.1 project overview3
2.2 Characteristics3
2.3 phase of the project4
2.4 Scope of work and work volume5
2.5 Project Target9
2.6Geography and Natural Environment10
3 construction organization plan12
3.1 construction disposition2
3.2 overall construction schedule plan14
3.3 manpower plan17
3.4 large-scale equipments plan17
3.5 organization of construction17
3.6 technical trainings18
3.7 Speciality cooperation18
4 Main construction scheme and measure19
4.1 Foundations check and accept project19
4.2 steel structure installation project19
4.2 installation of equipment19
4.3 installation of equipment23
4.4 piping32
4.5 Main technological scheme and measure of electric installation projects40
4.6 installation of instrument45
4.7 managementail measure of equipment and accessories57
4.8 standard and specification applied61
5 quality, safety and work period control67
5.1 quality certification systems67
5.2 acceptance of process equipment and materials70
5.3 Working Procedure Control0
5.4 quality control point plan71
5.5 Safety Guarantee System84
5.6 civilization construction1
5.7 control measuresof time limit for
您可能关注的文档
最近下载
- 油田开发与分析研究知识问答汇编.doc VIP
- 2025陕西公需课党的二十届三中全会精神解读与高质量发展答案.docx VIP
- NFPA 110-2019 国外国际标准.pdf VIP
- 宿舍规章制度十条.docx VIP
- (2025)第九届全国中小学“学宪法、讲宪法”活动知识竞赛题库及答案.pdf VIP
- 严明党的纪律和规矩论述摘编.docx VIP
- 福建省福州第一中学2024-2025学年高一下学期第四学段模块考试(7月期末)数学试题(含部分答案).pdf
- DB36∕T 1601-2022 猪场粪污异位发酵处理技术规程.pdf VIP
- 甘肃白银有色集团股份有限公司招聘真题.docx VIP
- 《科研基金申请撰写策略》课件.ppt VIP
文档评论(0)