* * Two different TMS path, operation path projects path Once a request from EGC release to EGQ, it must retrofit to EGD. From EGT to EGC, group/include all the requests (must belongs to the same project) into a single request. Any minor changes or development, where the impact to the system is small, and duration is short, use n transport path. Otherwise should use n+1 transport path. All request must assign to a project. * All Requests in a same project phase be include in a single request before import to EGC Use of automated testing tools (eg eCATT) can speed up the testing in EGC EGQ.