ab焦炉煤塔设备安装方案.docVIP

  • 7
  • 0
  • 约4.51千字
  • 约 12页
  • 2020-07-11 发布于山东
  • 举报
PAGE PAGE 1 ···········································2 施工部署············································3 施工方法············································4 吊装方法············································5 质量控制············································6 安全文明施工········································7 雨季施工措施·······································10 网络进度计划·······································11 1、工程概况 1.1 项目概况 项目名称 某京唐焦化工程AB焦炉煤塔设备安装工程 项目地理位置 唐山曹妃甸某京唐钢铁公司 工程范围及内容 煤塔设备安装图,图号:420EL13062 煤塔平板闸门,图号:13EL13139 设计单位 中冶焦耐工程技术有限公司 1.2 工作量 设备名称 型号 台数 单台重量(