《施耐德变频器ATV71系列维修资料》.ppt

《施耐德变频器ATV71系列维修资料》.ppt

  1. 1、本文档共64页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Modbus circuit ATV71 have two RJ45 conncetor, so there is two Modbus circuit Logic input circuit P5 CPU P24 SW1 RT1N431M Input Terminal CLI C2 C1 2SA1603 2SA1603 FUSE Li6 input circuit Attention the position of SW101,one for logic input ,the other for PTC input PWR protection function To detect external fault,normally short circuit with P24V. External circuit supply +24V for PWR as warning signal.Once external circuit failure , low voltage forward to PWR,the inverter will forbid the up IGBT bridge output ,it mean forbid output. APPLICATION BOARD Reset CPU A/D SCI Timer PC Timer PC EEPROM Sample hold circuit GTR7 MSRY Motor control circuit P5 VDET THR Iu Iv Iw Gate signals T1.T2.T3.T4.T5.T6 SAFE OSC(20MHz) Motor control circuit Function diagram safe Encode signal 24V BLIC BTRIP CFUW CFVW CRCFB CTF SDAP SLCP PASS BCV DRIVE BOARD Reset OPTION BOARD Application board S106 to terminal board S102 to motor board S105 to display board and option board S103 form drive board,offer P24 and fan signal The circuit P24 produce P15 P5 Ai1 Ai2 Ao circuit ADM485 for terminal board terminal board S106 to application board SW100 for source or sink selection SW101 for PTC or Li6 selection RJ45 for MODBUS PWR terminal Motor control board S101 for option card S102 to application board S100 to drive board,get some feedback signal(current,voltage) Drive board Power unit S 100 IGBT Inverter Gate Driver Motor Connection Supply S 103 EMC Filter Input Rectifier Soft-charge DC Filter U V W L1 L2 L3 S110 S120 FAN 24 V customer and fan cmd INSULATION PO PA PB PC Application Board Motor Control Board Switch power Supply start -VCA +VCA Up to 18.5kw,supply start get from DC bus voltage. Over 18.5kw ,supply start get from AC input due to SCR rectifier L1 L3 L2 +VCA First by half rectify to supply switch power,get +VCA and supply start signal.After switch power start,it control SCR working,then Dcbus circuit offer

文档评论(0)

kanghao1 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档