2017美赛题目(来源:科学网).docx

  1. 1、本文档共33页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
目录 TOC \o "1-3" \h \z \u 美国数学建模MCM A题(连续型)翻译 管理赞比西河 2 A题中文翻译: 3 2017美国数学建模MCM B题(离散型)翻译 收费后合并 5 B题中文翻译: 6 2017美国数学建模MCM C题(大数据)翻译 “合作和导航” 8 C题中文翻译: 10 C题重要提示: 12 2017美国数学建模ICM D题翻译 在机场安检站优化乘客吞吐量 14 D题中文翻译: 17 2017美国数学建模MCM E题(环境) 翻译 需要可持续城市! 20 E题中文翻译: 22 2017美国数学建模ICM F题(政策)翻译 迁移到火星 25 F题中文翻译: 29 A题: /blog-752541-1028671.html 美国数学建模MCM A题(连续型)翻译 管理赞比西河 PROBLEM A: Managing The Zambezi River The Kariba Dam on the Zambezi River is one of the larger dams in Africa. Its construction was controversial, and a 2015 report by the Institute of Risk Management of South Africa included a warning that the dam is in dire need of maintenance. A number of options are available to the Zambezi River Authority (ZRA) that might address the situation. Three options in particular are of interest to ZRA: (Option 1) Repairing the existing Kariba Dam, (Option 2) Rebuilding the existing Kariba Dam, or (Option 3) Removing the Kariba Dam and replacing it with a series of ten to twenty smaller dams along the Zambezi River. There are two main requirements for this problem: Requirement 1 ZRA management requires a brief assessment of the three options listed, with sufficient detail to provide an overview of potential costs and benefits associated with each option. This requirement should not exceed two pages in length, and must be provided in addition to your main report. Requirement 2 Provide a detailed analysis of Option (3) - removing the Kariba Dam and replacing it with a series of ten to twenty smaller dams along the Zambezi river. This new system of dams should have the same overall water management capabilities as the existing Kariba Dam while providing the same or greater levels of protection and water management options for Lake Kariba that are in place with the existing dam. Your analysis must support a recommendation as to the number and placement of the new dams along the Zambezi River. In your report for Requirement 2, you should include a s

文档评论(0)

188****0358 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档