CWS___OS
Low pH Desco
Length of Running String and Tools =
RKB
ID of Running String =
RKB to Subsea Wellhead =
RATE, bpm
AV, fpm
PUMP, spm
1. Davis Lynch Float shoe
2. 2-Joints #193, #192.
Type
Dual
50/50 Posmix
3. Davis Lynch Float collar.
Volume,bbl
Density, ppg
Additive 1
3%
您可能关注的文档
- 边循环边加重压井计算Wait-Weight Method Well Control Worksheet.xls
- 常规固井设计Casing & Cementing Conventional.xls
- 地层破裂试验记录表Leak Off Sheet.xls
- 地层破裂压力Formation Fracture Pressure.xls
- 固井设计表单Casing & Cementing Module.xls
- 固井水泥浆量计算CEMENT.XLS
- 海洋平台固井设计Casing & Cementing Module - Subsea.xls
- 井眼容积与泥浆泵计算Capacity of HoleNG.xls
- 壳牌压井计算shell kill.xls
- 泥浆泵缸套与排量计算PUMPS.XLS
原创力文档

文档评论(0)