整理大跨度变截面拱形立体管桁架的施工技术.pdf

整理大跨度变截面拱形立体管桁架的施工技术.pdf

大跨度变截面拱形立体管桁架的施工技术探究 摘要:本文主 要基于立体管桁架的吊装技术展开论述,其中着重论述了吊装选择 和结构计算。进而基于桁架结构的特殊性,阐述大跨度变截面拱形 立体管桁架的施工技术,尤其是关于拼接技术和焊接技术的阐述, 明确各施工段的施工工艺,以确保大跨度变截面拱形立体管桁架结 构的施工质量 关键词:大跨度;变截面拱形立体管;桁架; ;吊装;施工技术 abstract: this paper mainly based on the three-dimensional tube truss discussed the lifting technique, which focuses on the selection and installation structure calculation. and then based on the particularity of the truss structure, this paper expounds the big span cross-section of three-dimensional tube truss arch of construction technology, especially on the stitching technique and the welding technology, expounds the construction period clear, the construction techniques to ensure that big span variable cross-section vaulted solid quality of the construction of the tube truss structure keywords: big span; variable cross-section vaulted solid tube; truss;; lifting; construction technology 中图分类号: tu74 文献标识码: a 文章编号: 一、前言 进行大跨度变截面拱形立体管桁架施工中,吊装技术最为关键, 其涉及吊装类型的选择,吊装受力结构的设计,以及吊装施工点的 确定,这些吊装工艺,都是桁架施工的关键技术。同时,在施工建 设的过程中,结构的拼接技术和焊接工艺,都是施工质量控制的重 要方面,也是桁架施工工艺的核心。 二、立体管桁架的吊装技术 (一)桁架吊装的结构选择。大跨度变截面拱形立体管桁架,其 结构跨度大,需要采用双机抬吊的吊装模式,来实现大型机械的使 用。同时,基于双机抬吊结构,实现了轴向的空间受力结构,尤其 是其结构材料的高刚度, 实现了结构质轻、 抗压力强的特点。 同时, 在吊装的施工的过程中,其各设备部件,尤其是索具是否符合安全 要求,对于施工安全具有重要的影响。而且,桁架吊装的地基非常 重要,其在吊装前需要严格控制好柱高。 (二)吊装的结构计算,尤其是起重量和起重高度的计算非常重 要。吊装的起重质量要大于所有构件的质量,确保承载结构的稳定 性。吊装的起重高度,要基于索具高度和支座顶面高度,进行全面 的计算,控制更好吊装的起重高度。而关于吊装的工作范围计算, 需要基于跨度和起重机臂长,计算出起重臂长的仰角。同时,吊装 的坡度不宜大于 20°,避免高空滑行中出现速度过快, 而出现结构 受力不均衡的问题。 (三)起重机的选择。起重机的选择要基于起重量和起重高度, 进行科学的选择。而且,起重机的臂长要基于变截面的大小,进行 严格的控制。臂长的回转半径,是起重机性能的重要指标,其回转 半径要满足宽度需求。而且,大跨度下的桁架施工,采用双机抬吊 的结构,要控制好起重机自重,减少施工结构的受损。 (四)吊装吊点的选择。吊点的选择吊装施工的关键环节,尤其 是基于合理的吊点,是优化吊装结构的重要举措。吊点的选择要基 于施工跨度和起重量,确保吊装结构的受力均衡。同时,吊点的选 择直接影响着结构的受力分布,吊点最好设置于弯矩较大点,以到 达受力的合

文档评论(0)

1亿VIP精品文档

相关文档