0 / 7 0 / 7文档可自由编辑 WATER AND POWER DEVELOPMENT AUTHORITY KEYAL KHWAR HYDROPOWER PROJECT CONTRACT KKHPP-02 Keyal Khwar Hydropower Project in Pakistan Method Statement for Subgrade Rolling Compaction Construction of Keyal Valley Road and Patan-tunnel Road Document Preparation, Verification and ApprovalTechnical Engineer Document Preparation, Verification and Approval Technical Engineer Name in Print Wang.x.k Sign Prepared by Checked by Verified by Approved by Technical Dep. Manager Chief Engineer Project Manager Lvsheng Lvsheng Helin PAGE PAGE 2 / 7文档可自由编辑 Document Revision Table Document Rev