WATER CHILLERS 15680 - PAGE 1
WATER CHILLERS 15680 - PAGE 1
WATER CHILLERS 15680 - PAGE 1
SECTION 15680
WATER CHILLERS
PART 1: GENERAL
1.01 SECTION INCLUDES
A. Water chillers for HVAC installations.
1.02 RELATED SECTIONS
Section 15010 Basic Mechanical Requirements.
Section 15171 Electrical Requirements for Mechanical Equipment.
Section 15180 Building Management System and Automatic Controls.
Section 15500 Heating, Ventilation and Air Conditioning.
Section 15513 Noise and Vibration Control.
Section 15540 HVAC Pumps
Section 15856 Air Movers:
您可能关注的文档
- 16440-PANEL BOARDS英标建筑设计施工标准规范.docx
- 16010-BASIC ELECTRICAL REQUIREMENTS - R1英标建筑设计施工标准规范.docx
- 16330-POWER TRANSFORMERS英标建筑设计施工标准规范.docx
- 16220-DIMMING DEVICES英标建筑设计施工标准规范.docx
- 15486 COMPRESSED AIR SYSTEM英标建筑设计施工标准规范.docx
- 15484 FUEL OIL STORAGE AND PIPING SYSTEM英标建筑设计施工标准规范.docx
- 15475-SWIMMING POOL EQUIPMENT英标建筑设计施工标准规范.docx
- 15410 PLUMBING PIPING英标建筑设计施工标准规范.docx
- 15180-BMS AND AUTOMATIC CONTROLS英标建筑设计施工标准规范.docx
- TABLE OF CONTENTS英标建筑设计施工标准规范.docx
- 15930 AIR TERMINAL UNITS WITH VARIABLE VOLUME BOXES英标建筑设计施工标准规范.docx
- 15856- AIR MOVERS英标建筑设计施工标准规范.docx
- 15780 AIR CONDITIONING SYSTEM英标建筑设计施工标准规范.docx
- 15855 AIR HANDLING UNITS英标建筑设计施工标准规范.docx
原创力文档

文档评论(0)