6安全宣传教育培训活动记录.doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
6安全宣传教育培训活动记录 嘉兴市道路运输行业 安全管理工作台帐之 六 安全宣传教育培训 活 动 记 录 , 至 , 单 位 嘉兴市公路运输管理处印制 年 月 to comply with the requirements. (6) pressure pipes are installed according to the design requirements of the system pressure test, segmented tiered when pressure testing to be carried out in sequence, drainage, stormwater pipes to do water testing, and recording, pressure test failed or untested pipeline may not be concealed. Test pressure is the pressure piping installation one stops. (7) the control interface of pipeline leakage from the processing begins. Thread processing to tight fit, length should comply with the requirements. Flange after welding to check end verticality, checking the welding quality. (8) electrical engineering should control the grounding line of weld quality and laying of pipeline quality, timely measurement of grounding resistance, and completes the record. (9) the phase and neutral and ground wire to strictly control the installation location may not be wrong, to multi color lines as required. (10) the distribution box, distribution bottle Shell to a separate ground line, shell transitions can not be used. (C) the pipeline installation engineering 1. construction sequence (1) be familiar with design drawings and related technical information; (2) construction survey and setting out; (3) cooperate with the reserved, embedded civil work; (4) pipe and tube processing (5) support (hanging) production; (6) the pipe prefabrication and Assembly; (7) the pipe laying and installation; (8) the pipes connected to the device; (9), instrumentation and piping installed; (10) pressure test and cleaning (blowing) washing; (11), anti-corrosion and thermal insulation; (12) acceptance. 2. construction conditions (1) the design drawings, specifications and other technical documentation is complete, and after a trial. (2) construction project 安全宣传教育培训活动记录 年 月 日 星期 活 动 名 称 参 加 对 象 地 点 主讲人 参 加 人 数 记录人 教育培训活动内容,可粘附活动照片,: 2entation is complete, and after a trial. (2) con

文档评论(0)

Lilili小兑 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档