ABB PM Gold Load Centers Installation Instructions - TL240RCU, ML270RCU, TL270RCUP, TL270RCU, ML240RCU, TL240RCUP 手册(英语)说明书.pdf

ABB PM Gold Load Centers Installation Instructions - TL240RCU, ML270RCU, TL270RCUP, TL270RCU, ML240RCU, TL240RCUP 手册(英语)说明书.pdf

DEH–40221 Installation Instructions g PowerMark Gold™ Load Centers Rainproof 40–70 Ampere, Single-Phase 2 Circuit General 4 – For Top Feed, Screw Hub (not included) onto To comply with the Canadian Electrical Code and the Canadian Installed Conduit Standards Association, the load center must be installed in accordance with the information included on the label on the Raintight hubs can be installed in any of the four positions indicated below. 12 3 6 9 o’clock inside of the equipment. This must also be done in accordance with the applicable local electrical codes and by a qualified electrical contractor or licensed electrician. WARNING: Hazard of electrical shock or burn. Turn off power supplying this equipment before working inside. 5 – Fasten Hub to Box Installation Remove the factory-installed closing cap, then attach the hub 1 – Remove the Door with the four screws removed with the cap. No gasket is required. Discard the closing cap when a hub is used. Back out the door hinges. Remove

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档