Industrial context 3 Cheyenne ins Pipeline More than 140,000 tons of pipe and 25,000 individual sections were used to complete the Cheyenne ins Gas Pipeline Project. Each section of pipe is 78-feet long and per industry standards, was buried at least 30 hes below the ground through a trenching process. This project was the first major pipeline in the U.S. to u -80 grade pipe. Already a standard in other parts of the world, the X-80 pipe