风荷载的全方位计算.docVIP

  • 33
  • 0
  • 约4.72千字
  • 约 3页
  • 2023-11-27 发布于上海
  • 举报
风荷载的全方位计算 摘要:在高压架空送电线路设计中,最不利风向时的风荷载常决定着杆塔内力或基础作用力的大小。然而如何确定最不利风向以及最不利风向确定后计算结果是否严谨,本文将通过几个工程实例来说明这个问题。 Abstract:In the project design of overhead transmission lines,the wind load usually decides the size of the force in the tower or the basic force at the condition of the worst wind direction.But how to decide the worst wind direction and how? to know if the result is accurate after deciding the worst wind direction.this paper will explain this queastion through using some examples of project. Keywords: Complete Azimuth; Force on foundation ; Running conditions; imbalance tension; wind load

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档