PLC在应用中应注意的问题——外文翻译、中英文翻译.docVIP

PLC在应用中应注意的问题——外文翻译、中英文翻译.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
PLC在应用中应注意的问题——外文翻译、中英文翻译.doc

外文资料译文 PLC question PLC which should pay attention in the application is specially the control device which serves for the industrial production, usually does not need to take any measure, may use directly in the industry environment. But, when the production environment is too bad, the electromagnetic interference is special intense, or installs uses improper, cannot guarantee PLC the normal operation, therefore should pay attention to the following question in the use. First, Siemens PLC maintenance 1, maintenance procedures, equipment, periodic testing, adjustment provisions (1) half-yearly or quarterly inspection PLC cabinet terminal connections, and if time to re-loose strong local connection; (2) of the cabinet to the host power supply voltage of the monthly re-survey work; Second, the provisions of cleaning equipment on a regular basis (1) every six months or a quarter of the PLC to clean, cut off power to the PLC power supply to the power rack, CPU board and input / output board in turn be removed to purge, clean and then in turn installed in situ, will all link to resume evacuation call and start the host PLC. PLC box carefully sweeping health; (2) every three months to replace the power rack below the filter; three maintenance preparation, maintenance of order (1) ready before maintenance tools; (2) To protect the components and the template does not function no fault damage, must be protection devices and serious preparations for anti-static; (3) maintenance scheduling and operator contact before and well, be linked to overhaul licensing office hung maintenance card; 4, equipment and method of disassembly sequence (1) downtime, must be two or more monitoring operation; (2) the way the CPU on the front panel select switch from the Run to stop position; (3) Close the PLC power supply mains, and then close the other to the power supply module Osaka; (4) connected to the power supply rack power cord clear line number in mind and remove the link l

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档