- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Presentation
This contract is based on the Contract Law Construction of construction management decoration ,combining Shenzhen Decoration Association has developed the 2003 edition of the contract and I Division actual operation of the development.
Decoration repair project turn-key contract
Contract by: (hereinafter referred to as Party A)
Name: xx Shenzhen branch office attached ID card or fill out a copy of identity card number Is home Address: Address:
Identity card number : _______________Phone :___ _888xxxxx________________________________________
Contractor: Shenzhen Shuo Code Decoration Design Engineering Co., Ltd. (hereinafter referred to as Party B)
In accordance with the Contract Law of Peoples Republic of China, construction and installation works contract regulations and relevant laws, regulations, combined with the actual situation of the project, the two sides of equality, voluntary, consensus based on the agreement reached as follows:
A project overview
1.1 Project title :
1.2 site :
1.3 Contractor : this contract annex project budget
1.4 Contract means: The two sides agreed to adopt the following resolution means kinds of contract
1 Before packet materials Part of the contracting-included 3 Before not-included
1.5 Period: Start date: tentative on since _ years from the date (the actual calculation to B on the two sides confirmed that the construction plan and budget for the book from start to the day after the period) 1.6 Completion date :_ __The total duration for the day (as a result of rainy days, holidays or extended period of force majeure factors)
1.7 contract price (RMB capital) : )
¥ (A project budget book)
2、 Working Party
2.1 Party in the pre
文档评论(0)