- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
毕业论文(设计)
外文翻译
Developing Information Systems
In this and the following chapters, we will discuss different approaches concerning how an organization can obtain its information systems once the decision in favor of a system has been made.
While chapter 7 will deal with buying and introducing software that was developed by others, in particular standard software, the focus in this chapter is on how to build completely new information systems or new modules that extend existing information systems within an organization. By new modules we mean that significant development effort is required in order for the project to pass all stages of the software development process.
In contrast to this, limited extensions of a running information system are considered part of the maintenance and support stages. Adding functionality to a new standard software system will be discussed in chapter 7, as part of the customizing process.
The perspective taken in this chapter is that the starting point for the development effort is an approved project proposal (cf. section 2.2.1);
i.e., a managerial level decision to launch a project for building a system inhouse has been made. If no restrictions existed, we could say that the project starts from scratch. In the real world, however, such restrictions often limit the degrees of freedom substantially.
4.1 Starting with a Problem Specification
Constraints that a new information system development effort may need to observe include the following:
– The existing information systems landscape has to be considered. Most likely the new system will need to be interfaced with the companys ERP system and other information systems.
– The platform on which the new system will run is probably outside the scope of the project. If the companys existing systems are all based on IBM Web Sphere, for example, then it is unlikely that a different platform will be chosen for a new system which needs to be integrated.
– Depending on how closely the system is t
您可能关注的文档
最近下载
- 第3课+追求人生理想+第一框+第3目【中职专用】2024-2025学年中职思想政治《哲学与人生》(高教版2023基础模块).pptx VIP
- 2011年考研英语二真题及答案解析.pdf VIP
- 《建筑施工企业碳排放统计核算标准》.pdf
- 面向教学评价的情感分类.pptx VIP
- 人教A版必修第一册高中数学2.1等式性质与不等式性质【教学课件】.pptx VIP
- 《中药材炮制加工方法图解》.pdf VIP
- 小学残疾儿童送教上门教案(40篇).pdf VIP
- 羊群效应——一个班级最可怕的存在!--高一上学期班级凝聚力主题班会课件.pptx VIP
- Apple 环保系统操作说明FMD_Portal_TRM_Training.pdf
- 厄瓜多尔介绍PPT.pptx
文档评论(0)