基于Moodle平台的网络课程毕业设计.doc

  1. 1、本文档共89页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
摘要 本设计为京杭运河大桥主桥上部结构,本桥跨度是42.013+70+40.341。悬臂桥用平衡悬臂施工Abstract The design is for the Beijing-Hangzhou Grand Canal Bridge bridge structure the span of which is 42.013m+ 75m +41.m.and the section is single-box. The cantilever bridge use the methode of Balanced Cantilever construction .As aresult of the design load for seven, we use eight for security. The main structure of the bridge construction phase can be devide into three phases, in accordance with the beam of the order and process of construction of each beam as wellas the Cradle mobile place, pouring concrete, three-prestressed construction process being taken into account. Works with the actual situation, the construction of the calculation is divided into 31 stages of the force, "General procedures for calculation of the bridge," were the construction of the beam in the process of internal forces, stress, deflection was calculated and checked. The design of the main bridge across-the first closure, after the lifting of temporary anchor, the last in order to consider the cross-Closure, closure strictly control the temperature in the 11 ~ 16 ℃ The size of vertical and cross section of girder is determined. The internal force of construction and operational phase of the control section is calculated using Doctor Bridge structure-design, which include the dead load, the live load, temperature internal forces and infrastructure caused by the internal forces of the settlement. The intensity and stress of Control section is computed respectively according to the ultimate limit state of bearing capacity and the ultimate limit state of normal usage the Combination for action effects. The number of prestressed bond is estimation and arranged them. Checking satisfy the requirement of "Highway of reinforced concrete and prestressed concrete bridge design code". In addition, the bridge deck is designed. Key words: Continuous prestressed concrete girder bridge;balanced cantilever construction;combination for a

您可能关注的文档

文档评论(0)

2749166188 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档