摘要
本设计为京杭运河大桥主桥上部结构,本桥跨度是42.013+70+40.341。悬臂桥用平衡悬臂施工Abstract
The design is for the Beijing-Hangzhou Grand Canal Bridge bridge structure the span of which is 42.013m+
75m +41.m.and the section is single-box. The cantilever bridge use the methode of Balanced Cantilever construction .As aresult of the design load for seven, we use eight for security.
The main structure of the bridge construction phase can be devide into three phases, in accordance with the beam of the order and process of construction of each beam as wellas the Cradle mobile place, pouring concrete, three-prestressed construction process being taken into account. Works with the actual situation, the construction of the calculation is divided into 31 stages of the force, "General procedures for calculation of the bridge," were the construction of the beam in the process of internal forces, stress, deflection was calculated and checked. The design of the main bridge across-the first closure, after the lifting of temporary anchor, the last in order to consider the cross-Closure, closure strictly control the temperature in the 11 ~ 16 ℃
The size of vertical and cross section of girder is determined. The internal force of construction and operational phase of the control section is calculated using Doctor Bridge structure-design, which include the dead load, the live load, temperature internal forces and infrastructure caused by the internal forces of the settlement. The intensity and stress of Control section is computed respectively according to the ultimate limit state of bearing capacity and the ultimate limit state of normal usage the Combination for action effects. The number of prestressed bond is estimation and arranged them. Checking satisfy the requirement of "Highway of reinforced concrete and prestressed concrete bridge design code". In addition, the bridge deck is designed.
Key words:
Continuous prestressed concrete girder bridge;balanced cantilever construction;combination for a
您可能关注的文档
- MT电厂电气一次初步毕业设计-.doc
- 毕业论文(论文)LC带通滤波器的设计与仿真设计.doc
- 智能救援小车毕业论文(设计)完整版.doc
- 基于JAVA的数码商品网上商城的毕业设计与实现.doc
- 基于Java的图书管理信息系统的设计与实现毕业论文.doc
- 基于c#房屋租赁管理系统的设计和实现毕业设计(论文).doc
- 基于JSP技术的银行管理系统的毕业设计与实现.doc
- 基于MATLAB的三相整流电路仿真研究.doc
- 单片机最小系统设计与制作报告毕业设计(论文).doc
- 基于matlab的数字滤波的毕业设计与仿真论文.doc
- 第12课 我们小点儿声 课件 二年级道德与法治上册(部编版).ppt
- 11.2我从哪里来(教学课件)二年级道德与法治下册(统编版).ppt
- 第10课 我们不乱扔 课件 二年级道德与法治上册(部编版).ppt
- 1.3过好我们的课余生活 课件五年级道德与法治上册(部编版).ppt
- 第四单元《法律保护我们健康成长》大单元整体学程设计道德与法治六年级上册统编版.pdf
- 第十一课:多姿多彩的民间艺术(分层练习)四年级道法下册 部编版.pdf
- 第八课:大家的“朋友”(分层练习)三年级道法下册 部编版.pdf
- 第5课 我爱我们班 课件 二年级道德与法治上册(部编版).ppt
- 第二单元 我们是公民 大单元整体学程设计道德与法治六年级上册统编版.pdf
- 人教部编版二年级语文下册第五单元单元教学课件.ppt
1亿VIP精品文档
相关文档
最近下载
- 部编版三年级语文下册《语文园地六》教学课件.pptx
- 雨污水溯源排查方案.docx VIP
- 计算机网络应用专业一体化课程方案.pdf
- MITSUBISHI三菱MELSEC iQ-F FX5-CCL-MS 硬件手册.pdf VIP
- MITSUBISHI三菱MELSEC iQ-F FX5-CCLGN-MS 硬件手册.pdf
- 《信息技术与高中数学教学整合研究》课题研究报告.doc
- 《发展经济学》课程思政教学案例.docx
- 护士资格《循环系统疾病病人的护理》心律失常病人的护理教学教案模板.doc
- 全球数字经济白皮书(2023年)-中国信通院-2024.1-.pdf
- -e长大后我就成了你声乐正谱钢琴伴奏五线谱.pdf
文档评论(0)