【创新方案】高中英语Module6 Section Ⅰ Ⅰntroduction & Reading pre reading课件 外研版必修3.pptVIP

【创新方案】高中英语Module6 Section Ⅰ Ⅰntroduction & Reading pre reading课件 外研版必修3.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
返回 Module 6 Section Ⅰ Step 1 Step 2 Step 3 Step 4 Step 5 1.Could you tell us some historical sites? Which one have you visited? 2.Is it dangerous when water rose to the maximum level at China‘s Three Gorges Dam? Water rose to the maximum (最高的) level at Chinas Three Gorges Dam, driving electricity output to full capacity (生产量) at the worlds largest hydropower plant for the first time since it began operating. The dam is a $ 23 billion project on the upper reaches of China‘s longest river, the Yangtze River. It was built to end centuries of floods and to provide energy to fuel the country’s economic growth. Construction of the 410-mile-long(660-kilometer-long) reservoir began in 1993 and it began storing water in 2003. Its water level hit its peak height of 175 meters at 9 am on Tuesday, according to project operator, the China Three Gorges Project Corp. The previous record was 172.8 meters (567 feet) set in 2008, the year when the generators began operating. Company chairman Cao Guangjing called it a “historic milestone”. He said annual powergeneration would reach 84.7 billion kilowatt hours, which would enable the project to realize its function of power generation to the full. To reach that level, dam officials had begun holding back water in September. The water level will be kept at the current height for about two months and then be allowed to drop. In the future, the water level will be kept between 145 meters (476 feet) and 175 meters (574 feet), depending on flood control needs. But that could carry risks. Last year, a Chinese magazine Caijing mentioned a government report that warned that rising water levels were increasing landslide risks as the soil around the dam became more unsettled. But expert Yan Echuan, part of an expert team hired by the government to assess(评估) geological risks of the project, said he didn‘t believe that keeping the water at the maximum level caused an increased

您可能关注的文档

文档评论(0)

精品教学资料 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档