- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
3GPP LTE 200906版相关CRs列表
只在少数特殊场景可能产生影响的CRs
对IOT有影响的CRs
Title
Version Differential Analysis (Sept. 2009 v.s. Jun. 2009)
Date
RWG_Tdoc_Nb
Specification
Current Version Number
New Version Number
CR Number
Revision Number
CR Subject
Category
Related Features
Applicable to UE
Applicable to eNB
Applicable to MME
Applicable to S-GTW
ASN.1 Impacting
Consequence of not supported by any Node
8.7.0
F
Yes
No
-
8.6.0
8.5.0
Feature group reporting
The CR concerns specification guidelines and hence does not to affect any functionality for actual implementations.
序号
测试类别
子类别
子子列别
测试用例编号
用例名称
测试用例优先级
影响的CR编号
影响程度
影响的简单描述
200903版本设备与200906版本设备进行IOT测试时是否需要实现该CR
Summary
N1
N2
Consequence of not supported by N1 but supported by N2
Consequence of not supported by N2 but supported by N1
Comments from Standards
TDD Uu IOT Impact
R1-091620
36.211
Correction on UE behavior for PRACH 20ms periodicity
For PRACH 20ms period, a UE on fast handover may need to transmit PRACH before obtaining radio frame. For frame structure 1 it is described in 36.211 that UE may assume the time difference between current cell and target cell is less than 5ms. However, for frame structure 2, UE behavior is missing.
PRACH
Yes
No
UE
eNB
performance degradation
no impact
same behaviour for TDD and FDD
Y
R1-092036
36.212
Clarify some parameters for determining control resources on PUSCH
(1) Clarify that parameters M_sc^{PUSCH-initial}, C and K_r are determined based on the respective SPS scheduling assignment or RAR grant, when applicable. (2) Clarfiy that N_symb^PUSCH-initial is obtained from the initial PUSCH transmission for the same transport block. Clarfiy that N_symb^PUSCH-initial is obtained from the initial PUSCH transmission for the same transport block.
ctrl over PUSCH
N
different behaviour in resource calculation when no explicit UL grant.
resource calculation when no explicit UL grant were un-specified.
The correction in this CR has an isolated impact, as it only fixes the incorrect description in the
文档评论(0)