- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
高速铁路车网耦合诱发的暂态谐振过电压仿真研究摘 要随着我国高速铁路的快速发展,对牵引供电系统提出了许多新的课题。其中电力机车在过电分相时与接触网耦合产生的暂态谐振过电压及其防护就是其中一个问题。目前对过电压产生的机理还没有完全弄清楚,在工程上还没有得到很好的解决,暂态谐振过电压仍随时威胁着电气化线路与机车的安全可靠运行和高速铁路效率的发挥。因此针对这一问题进行研究,不但具有理论价值,而且对指导工程实际和设计具有重要意义。本文首先对牵引供电系统供电方式和电分相方式进行了详细的介绍,然后对电气化铁路牵引供电系统进行计算。其次建立了基于PSCAD/EMTDC仿真的牵引供电系统和电力机车动态模型。最后针对现阶段高速铁路运行中机车过分相产生过电压的现象,根据过电压机理分析和仿真实验结果,提出了抑制电力机车过分相暂态谐振过电压的措施。关键词:高速铁路;暂态;电分相锚段关节;谐振过电压;PSCAD/EMTDCThe simulation research on the vehicle network oupling resonance over-voltage by High-speed RailwayABSTRACTWith the rapid development of high-speed railway in China, for the traction power supply system and put forward many new topic. The transient resonance electric locomotive produce and catenary coupling in phase separation when overvoltage protection is one of the problems. At present the mechanism of overvoltage is not fully understood, has not obtained the very good solution in engineering, transient overvoltage still threatens to play safe and reliable operation of electrified railway and locomotive and railway efficiency. Therefore, researches on this problem, not only has theoretical value, but also has important guiding significance in practical engineering and design. This paper first carried on the detailed introduction to the traction power supply system power supply and electric phase, and then on the electrified railway traction power supply system for calculation. The traction power supply system and electric locomotive dynamic model based on PSCAD/EMTDC simulation. Finally, aiming at the present stage of high-speed railway locomotive running excessive over-voltage over-voltage phenomenon, according to the mechanism analysis and the simulation results, the suppression of electric locomotive excessive phase transient overvoltage measures.Key words: high-speed rail; transient; articulated phase insulator; resonance over-voltage; PSCAD / EMTDC高速铁路车网耦合诱发的暂态谐振过电压仿真研究1摘 要1ABSTRACT2第1章绪论51.1课题研究意义51.2国内外研究现状61.3 PSCAD软件介绍71.3.1软件介绍及功能71.3.2PSCAD的安装71.4本文研究的主要
文档评论(0)