- 1
- 0
- 约1.93万字
- 约 53页
- 2017-08-20 发布于辽宁
- 举报
xxx废旧金属分拣交易中心
升级改造建设项目
可
行
性
研
究
报
告
编制时间:二○○九年四月
目 录
第一章 总 论·········································1
1.1 项目概况··········································1
1.2 项目单位基本情况··································1
1.3 项目建设规模及内容································1
1.4 建设期限··········································2
1.5 项目总投资········································2
1.6 资金来源··········································2
1.7 项目效益··········································2
第二章 项目建设必要性可行性···························3
2.1 项目建设背景······································3
2.2 项目建设必要性····································5
2.3 项目建设的可行性··································7
第三章 市场需求预测···································9
3.1 市场预测··········································9
3.2 供求预测··········································10
第四章 建设规模内容与厂址选择························12
4.1 建设规模内容······································12
4.2 土建工程设计方案··································12
4.3 项目厂址选择······································14
4.4 防火措施··········································16
4.5 电力··············································17
4.6 给排水············································18
第五章 项目实施生产方案·······························20
5.1 项目规划目标及总体思路····························20
5.2 项目建设工期······································20
5.3 项目实施进度······································21
5.4 生产工艺及产品方案································22
第六章 环境保护······································26
6.1 污染物及来源······································26
6.2 施工期污染防治措施································26
6.3 营运期污染防治措施································28
第七章 公司定员······································30
7.1 组织机构··········································30
7.2 工作制度··········································30
7.3 劳动定员··········································30
7.4 职工培训··········································30
第八章 投资估算及资金筹措·····························32
8.1 工程概况·········································
您可能关注的文档
- (硅石矿)某县硅石矿采矿环境影响情况评估报告表.doc
- 白癜风资料大全集.doc
- 板栗深加工项目可行性分析论证报告.doc
- 宾馆装修改造项目可行性分析论证报告.doc
- 滨海商务城建设可行性分析论证报告.doc
- 采云间九峰茶生态园工程可行性分析论证报告.doc
- 彩印包装建设项目可行性分析论证报告.doc
- 残疾人康复和托养服务中心项目可行性分析论证报告.doc
- 昌化路改造工程环境影响情况评估报告表.doc
- 陈家镇中心幼儿园建设项目可行性分析论证报告.doc
- 广东省广州省实验中学教育集团2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州大学附属中学2025-2026学年八年级上学期奥班期中物理试题(解析版).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(含答案).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(解析版).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 2026《中国人寿上海分公司营销员培训体系优化研究》18000字.docx
- 《生物探究性实验教学》中小学教师资格模拟试题.docx
原创力文档

文档评论(0)