GOES-8 to GOES-12 Transition.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
GOES-8 to GOES-12 Transition.ppt

GOES-8 to GOES-12 Transition Direct Readout Conference Cindy Hampton NESDIS/Office of Satellite Operations Agenda Background Operational Transition Requirements Schedule Start Up Activity Product Transition Issues and Concerns Background GOES-8 Launched April 13, 1994 GOES-8 Last Inclination maneuver: December 2002 Partial maneuver due to amount of fuel remaining Inclination requirement exceeded in April 2003: + 0.5 degrees GOES-12 launched in July 2001 and currently in storage mode at 105W. Operational Transition Requirements Minimal impact to users: no requirement to re-point GVAR antennas Provide sufficient testing period to evaluate GOES-12 performance by OSDPD, OSO and users Maintain continuous GOES-12 GVAR once has returned to normal on-orbit mode. A single switch for users from GOES-8 to GOES-12 GVAR Minimize RF interference during transition SOCC Schedule Return GOES-12 to On-orbit mode: January 9 Perform GOES-12 yearly north-south maneuver: January 14 Start GOES-12 Eastward Drift from ~110W towards 75W (~0.4 deg per day): January 17 Turn on Solar X-Ray Imager (SXI) High Voltage Power Supply and begin Imaging: January 21 Perform Image Navigation and Registration (INR) Recovery: January 20-24 Provide GVAR for user testing during drift: January 24-March 31 SOCC Schedule GOES-12 reaches ~ 81W: March 31 Perform swap of GOES-12 GVAR data for GOES-8 as GOES-East using GOES-8 GVAR transponder. GOES-8 data would be available as backup via a ground patch. Continue GOES-8 – normal housekeeping schedule GOES-12/GOES-8 Cross Over: April 20 SOCC Schedule Stop GOES-12 drift at 74.5W: April 22 Communication Services switch over (e.g. WEFAX, EMWIN, DCS, SARSAT) Start GOES-8 westward drift maneuver towards 105W: April 24 GOES-12 Imagery outage for ~2 hours due to RF command interference. GOES –10 Full Disk Start Up Activity January 9-24 Scan Mirror Contamination Avoidance Outgassing if required Radiometric Calibration with

文档评论(0)

gshbzl + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档