- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
SECTION 106 CONTROL OF MATERIALS
106.1 General
(1) Provide materials conforming to the contract. Use materials the contract specifies unless the engineer
authorizes substitutes under 108.8. Monitor construction operations to identify potential nonconforming
materials and prevent their incorporation into the work. Except as required under the contract, ensure that
products incorporated into the work, either temporarily or permanently, do not display advertising or
messages that are not directly related to the manufacturer, properties, or function of those products; or
advertising or messages in violation of state statutes.
(2) All materials are subject to the engineers approval before incorporation into the work. The engineer may
inspect or test all materials at any time during their preparation, storage, and use. Notify the engineer of
the proposed source of materials before delivering those materials to the project site. If the engineer
requests, provide samples of material and access to facilities that the engineer needs to assess the
acceptability of all materials. The department will, on request, share with the contractor available
information on a source or material. The department will maintain a web-based list of approved aggregate
sources. Aggregate producers must provide test results as required in the department policy for
aggregate source approval to have their source approved and to keep that approval over time.
(3) For fabricated components, the materials and the fabricator are subject to the departments approval
before delivery of those components to the project site. The engineer may require the contractor to obtain
components from another department-approved source if the department determines that a fabri