Arc Flash Specification.docVIP

  1. 1、本文档共3页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Arc Flash Specification.doc

Arc Flash Specification OBJECTIVE The purpose of this project is to provide a complete arc flash program for XYZ Company to help protect individuals working on its premises from electrical arc flash hazards. These individuals may include any workers who inspect, maintain or operate energized electrical equipment. The program shall bring XYZ Company into compliance with the applicable standards for new installations (NEC) and for worker safety in operating facilities (OSHA 29 CFR 1910, NFPA 70E-2004). The program shall assist XYZ Company with improving the reliable operation of the electrical system. PROJECT SCOPE System Data The supplier shall provide an up to date electrical system single-line diagram as required by NFPA 70E, 2004 Edition, “Standard for Electrical Safety in the Workplace”, as referenced in OSHA 29 CFR 1910 Subpart S, Appendix A. This information shall include nameplate data for electrical components (e.g. transformers, medium voltage switchgear, panelboards, switchboards, motor control centers, etc.) for all portions of the electrical system from the utility intertie through the lowest rated panel. Cable sizes, types and lengths between electrical equipment components and up to date utility source data shall be provided for an accurate single-line representation of the electrical system. Unique characteristics of the equipment installation shall be provided which may impact the magnitude of the potential hazard (e.g. open space versus enclosure). Overcurrent device settings shall be verified. Data collection may require removal of barriers, opening of front panels, etc. while equipment is energized. The supplier must provide proof (written documentation) that its employees working on the premises of XYZ Company have been properly trained in the use and application of personal protective equipment (PPE) and the hazards of working on or near energized equipment. The supplier must provide its own PPE protection with a minimum arc thermal pe

文档评论(0)

hsti + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档