- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
重庆大学本科学生毕业设计
水银洞金矿年产30万吨地下开采初步设计
学生:
学号:
指导教师:
专业:采矿工程
重庆大学资源及环境科学学院
二O年五月
Graduation Design of Chongqing University
Design of Shui Yindonggold mine which yearly produced 300,000 ton new minein Sichuan Province
Undergraduate:Zhang Nan
Supervisor: Li Lin
Major: Mining Engineering
College of Resources and Environmental Science
ChongqingUniversity
May 2014摘要
这次毕业设计题目年产0万吨初步设计a、Ⅱf、Ⅰa为最主要矿体。矿体呈缓倾斜分布。倾角大约在50-100。在对为期两周的毕业实习基础上,以为蓝本,根据老师所给的水银洞的矿床地质等地质条件和现有生产设备等技术条件,按照国家规程规范等设计文件要求,结合自己所学的知识和所掌握的信息,设计出了比较完整合理的开拓方案。设计中采用;采用对角式通风,这样可以减小工程量,并且通风效果也好
通过对经济技术进行比较过后,其设计的开拓方案、采矿方法及相关设备均能满足矿井年产30万吨
关键词:水银洞金矿,矿井初步设计,近水平矿体,箕斗罐笼综合提升,上向分条充填采矿方法
ABSTRACT
The topic of this graduation design is The preliminary design of Underground goldmining in SHUIYIN cavity whose Annual output is of 300000 tons . The total number of the orebodys that in control is 23 in current, and Ⅲc,Ⅲb,Ⅲa,Ⅱf,Ⅰa are the main orebodys. Orebodys are arranged in slowly inclined state. The angel is approximately ranges from 5 to 10 degrees. On the basis of the 2 weeks’ graduation practice of the JIN RIVER’ phosphorite in Sichuan Province;and taking it as the blueprint; according to the geological conditions given by our teacher of the mineral deposits of the quarts in SHUIYIN cavity and the technical conditions of the existing production equipment etc,;also with the documents designing requirements, such as national regulations and specifications;finally combined with the knowledge I learned and the information I grasped. A relative complete and reasonable development scheme is designed .The design use the new method which is called Skip cage comprehensive upgrade.The ventilation is Diagonal wings,because this can reduce the engineering.The mining method in this gold mining is upward strip filling.,which has a higher stoping rate.
Based on the economic and technical comparison ,we concluded that the development plan , the mining method and the associated equipments all can meet the mining requirements ,which is annual
您可能关注的文档
最近下载
- (2024秋新版)人教版七年级数学上册全册PPT课件.pptx
- dixell帝思 xc15cx-xc35cx 调试维修参数设置资料.pdf
- transcad交通需求模型手册_chapter12公交分配.pdf VIP
- 高校后勤餐饮经营发展探究——以浙江树人大学为例.pdf VIP
- 幼儿园教室环创培训.pptx VIP
- 2023辽宁沈阳市铁西区面向全区招聘社区残疾人工作专职干事8人考试备考题库及答案解析.docx VIP
- 2025年安徽省池州市辅警协警笔试笔试预测试题(附答案).docx VIP
- 《追求理解的教学设计》读书心得.docx VIP
- 糖皮质激素诱导骨质疏松诊治专家共识.pptx VIP
- 2025内蒙古巴彦淖尔市能源(集团)有限公司第二批招聘55人笔试模拟试题及答案解析.docx VIP
文档评论(0)