项目管理表格-项目计划(Excel).xlsVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Project Plan Project Plan (chinese) 1 day Manage against SLAs Copyright Method123 Ltd 2000 PROJECT PLAN Project Name: Project Manager: Project Planner: Summary Duration Expenditure ID Task Name Resource Start Finish Labour Cost Equip. Cost Other Costs Total Cost PREPARATION Perform feasibility study Perform risk impact assessment Document business case Document umbrella contract Obtain interim funding Business case interim funding approved PROJECT DEFINITION Define Project Document project definition report Document project plan Document quality plan Document resource terms of reference Project definition approved Agree Contract Document vendor/client contract Vendor/client contract agreed ANALYSIS Document high-level business requirements Document high-level technology requirements Document detailed business requirements Document detailed technology requirements Requirements approved DESIGN Document current state design Define process model Define organisational chart Define location chart Define data architecture Define application architecture Define technical architecture Current state design approved Document future state design Future state design approved Perform detailed planning Define organisational change strategy Define development strategy Define testing strategy Define implementation strategy Define acceptance strategy Define operational support strategy Detailed planning approved Detailed planning completed DEVELOPMENT Build IT Infrastructure Build prototype Design physical prototype Build physical prototype Test physical prototype Implement prototype Market and approve prototype Prototype authorised Build database Develop database Produce database design Build database testing routines Perform database unit testing Develop data migration Produce data migration design Build data migration components Build data migration testing routines Perform data migration unit testing Database development complete Build application software Design software

文档评论(0)

***** + 关注
实名认证
文档贡献者

本账号下所有文档分享可拿50%收益 欢迎分享

1亿VIP精品文档

相关文档