Deep pits excavated by stages and dewatered openly under complex
geological condition
LI Bing-heLIU Xing-wangCAO Guo-qiang
(Zhejiang Province Architectural Design and Research Institute, Hangzhou 310006, China)
Abstract: Line-up piles were used as the retaining wall of a deep excavation. Due to the complexity of geology, the pit was
excavated by