TU463 A 2006)S0184904 1973 Deep pits excavated by stages and dewatered openly under complex geological condition LI Bing-heLIU Xing-wangCAO Guo-qiang (Zhejiang Province Architectural Design and Research Institute, Hangzhou 310006, China) Abstract: Line-up piles were used as the retaining wall of a deep excavation. Due to the complexity of geology, the pit was excavated by