3rd Street Light Rail.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
3rd Street Light Rail.ppt

3rd Street Light Rail Process and Challenges of Developing Transit Signal Priority Outline Project Background Existing Conditions General Project features Timeline and Goals Transit Priority Software selection process Vissim Modeling Results Lessons Learned Existing Conditions 5.4 mile corridor 35 signalized intersections 3 traffic lanes in each direction with parking Serviced by MUNI’s 15 Bus line 7 to 15 minute headways Current ridership: 25,000 General Project Features – Phase 1 65 signalized intersections 19 stations 2 traffic lanes in each direction with left turn pockets at some locations Most blocks have parking, with parking removed near stations and left turn pockets Exclusive Right of Way except Bayview Commercial Core and 4th St. Bridge Transit Signal Priority Preemption Funding: $520 million, Local Sales Tax Intial Phase New Central Subway to Chinatown Funded by Federal Match Currently in Conceptual Engineering 4 Underground Stations Project Goals Improve Transit Service along Corridor Reduce travel time and delay Increase ridership Connect Southeast SF to Downtown Transit Oriented Development Economic Revitalization Transit Ridership Travel Times Construction Schedule TSP Elements 2070 (TS2) Signal Controllers with Transit Preemption/Priority capabilities Fiber Optic Cable for Communication Linked to Central Traffic Management Center (SFgo) Vehicle Detection System: Video (Autoscope) LRV Detection System: VETAG Transit Priority Vision Trains travel station to station without stopping! Progression on 3rd Street essentially maintained No phase waits more than 1 cycle (90 sec) Side Streets, Left turns and Pedestrians are actuated Pedestrians receive enough time to cross street at 4 ft/sec, or 2.5 ft/sec if phase is actuated Transit Priority Strategies Skip Phases Extend Phases Shorten Side Street Phases Lead/Lag (phase rotation) Early Green Get Back in Step within 1 Cycle Software Selection Challenges Meet technical requirements city-wide im

文档评论(0)

shengyp + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档