- 1、本文档共82页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Abstract Abstract Asthe ofthe ofour inrecent developmentrailway country years,the
constructionof the station hassomenew railway building requirements.Notonly the and ofthe alsothe
considering function,economyblazonry building,but of thelandmarkofthe hastobe
requirement city considered.Theand management
estimateofthe station are neededforeach railway buildings urgently deparment. researchoftheinvestmentof
Therefore,the station andthe railway buildings ofthe and ofthe station
developingmanaging analyzingsystem railway building investmentis verynecessary. therealneedsofthe and Considering review onthe design department,based and
modularity related and theory estimatingtheories,themanaging analyzingsystem
ofthe station investmentis the railway building funtions,include developed.Many and ofthedata,the ofthe could
managinganalyzing estimatinginvestment, the of of station
enormously and improveefficiencydesigningrmlway buildings referencesand for
review,and technoeconomic and provide supports decision-making
investmen.contr01. Basedonthelucubratetotheinformationand related and system theory theconstructiondemandsof have
technology,combined station,this rmlway paper feasible architecture the ofdemand
proposed system scheme,by followingsteps
analysis—systemdesign—system thewhole implementation,accomplishedsystem workas follows:
development.Main 1.Demand analysis study This a the to demand inameticulousand paperpresentsstudy analysis deep thesame researchanddemonstrationsomeofthe in way,at time,we
going problems
theconstructionof station processrailwaybuildingrepeatedly.What’Smore,wegive
acollectiontothe Establishedor constructedstations being railway systematically
whichestablishesthefoundationfor and works. design subsequent develop architecturescheme 2.System Abstract Atthe of firstconfirmthewhole aspectsystemdesign,we systemframework;
disassemblethe informationintothreefunction complex system relatively modulesor and was
independentsubsys
您可能关注的文档
最近下载
- 2023年7月浙江省普通高中学业水平考试真题试题 .pdf VIP
- 小学美术单元整体教学设计案例(5页) .docx VIP
- 精品解析:2023-2024学年广东省深圳市龙华区教科版五年级下册期末考试科学试卷(解析版).docx VIP
- 海通证券-2025年有色金属行业策略:东方既亮,乘势而上.pdf VIP
- 2023-2024学年浙江省9+1高中联盟高一下学期学考模拟化学试题(解析版).docx VIP
- PROTEUS软件培训介绍.docx VIP
- 大学生活畅谈演讲稿PPT.pptx
- 苏科版(2024)新教材七年级生物下册第五单元第12章第2节《植物维持生物圈中的碳氧平衡》优质教学设计(含两课时).doc VIP
- 周绍敏电工技术基础与技能习题与答案.doc VIP
- 17ZZ01 市政过水箱涵.pdf VIP
文档评论(0)