- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Shipping department shall give the Product Consultant / Builder sufficient advance notice for all site deliveries to ensure there is a plan for unloading, so that Product Consultant / Builder can mobilize suitable crane and manpower for unloading of material.
A delivery note is always enclosed with the supplied materials to clarify name of project, location, building number, type of materials, quantity, date of delivery, etc.
Upon arrival of materials at the storage yard, the Builder’s material controller will match delivery notes and shall verify the consignment. The material controller, then, reports to the site supervisor the received material list and quality condition.
There should be an Appointed Person by Builder who will be having overall control of all lifting operations on site and the Appointed Person must ensure that everyone in the crane team has studied this manual and is aware of the correct procedures to adopt in the cases not covered by this manual.
PLANNING THE LIFT
Planning the lifting operation is essential to ensure that the lift is carried out safely and efficiently. The following points must always be considered:
Where the load is to be picked up from
Where the load is to be placed
What areas are to be passed over
Proximity of the other contractors workers
Any obstructions in the way
How the load is to be slung
How the slings are to be removed
How the crane driver will be directed
The weight of the load
The weather
THE LIFT
Before Lifting
Only authorized slingers / signallers should sling the loads. After slinging, but before lifting, the following must be considered:
Are the slings undamaged and properly attached to the load?
Is the crane hoist rope vertical?
Is the load free to be lifted, i.e. not fixed to anything else?
Is the safety latch on the lifting hook closed?
Are all personnel clear of the load?
Is the landing site prepared to take the load?
Are the legs of a multi-legged sling equally loaded?
Is there a slinger / signaller in po
您可能关注的文档
- [ar03-57]Failure Modeling of Titanium 6Al-4V and Aluminum 2024-T3 With the Johnson-Cook Material Model英文资料.pdf
- _Chinese Material Manual英文资料.pdf
- 1.material studio interface英文资料.pdf
- 4_2 strength of material英文资料.pdf
- 07-755252-0001 Material test report英文资料.pdf
- 1975_A continuum theory of elastic material surfaces英文资料.pdf
- 2011-A review on preparation of SDC-carbonate as composite electrolyte material for intermediate temperature Solid Oxide英文资料.pdf
- 2012 Market Research Report on China Carbon Carbon Composite Material Industry英文资料.doc
- A fiber-ceramic matrix composite material model for osteonal cortical bone fracture micromechanics solution of arbitrary microcracks interaction英文资料.pdf
- A Geometric and Material Nonlinear Plate and Shell Element英文资料.pdf
- A review on the electrochemical sensors and biosensors composed of nanowires as sensing material英文资料.pdf
- A simple ballistic material model for soda-lime glass英文资料.PDF
- a study on plasticity and compression strength in wet iron ore green pellets related to real process variations in rea material fineness英文资料.pdf
- Access_Material_Database_230105英文资料.ppt
- Adib_2007_Aircraft-engine-bleed-system-tubes-Material-and-failure-mode-analysis英文资料.pdf
原创力文档


文档评论(0)