- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
《sap_PP_模块介绍》.ppt
Production Planning and Control Production Planning and Control Production Planning and Control Production Planning Process (1) Production Planning Process (2) Using MPS you can carefully plan important parts or bottleneck parts in a separate planning run at the highest BOM level before the planning results have an effect on all of the production levels. The central role of MRP is to monitor stocks and in particular, to automatically create procurement proposals for purchasing and production (planned orders, purchase requisitions or delivery schedules). This target is achieved by using various materials planning methods which each cover different procedures. Consumption-based planning is based on past consumption values and uses the forecast or other statistical procedures to determine future requirements. The procedures in consumption-based planning do not refer to the master production schedule. That is, the net requirements calculation is not triggered either by planned independent requirements or dependent requirement. Instead, it is triggered when stock levels fall below a predefined reorder point or by forecast requirements calculated using past consumption values. The lot-size calculation is carried out in MRP. In the net requirements calculation, the system determines material shortages for each requirement date. These shortage quantities must be covered by receipt elements. The system then calculates the quantities required for the receipts in the planning run in the procurement quantity calculation. In static lot-sizing procedures, the procurement quantity is calculated exclusively by means of the quantity specifications entered in the material master. Features The following static lot-sizing procedures are available: Lot-for-lot order quantity Fixed lot size Fixed lot size with splitting and overlapping Replenishment up to maximum stock level In period lot-sizing procedures, the system groups several requirements within a time interval together to fo
您可能关注的文档
- 《Retpol PP 7552 原包正牌料》.doc
- 《Retpol PP 7555 HS UV2 原包正牌料》.doc
- 《Retpol PP 7559 HS UV1 原包正牌料》.doc
- 《Retpol PP 7575 HS UV1 原厂原包》.doc
- 《Retpol PP 7856 HS UV2 原包正牌料》.doc
- 《Retpol PP 9010 HS 原包正牌料》.doc
- 《Reversible lithium storage in LiF Ti nanocomposites》.pdf
- 《review sub space identification Qin》.pdf
- 《Review_Paper_SIAM_Review》.pdf
- 《Rexroth Ecodrive03系列DKC驱动器故障排查手册》.pdf
文档评论(0)