2.1 ECC Acceptance Report
RABIGH 2 x 660 MW IPP PROJECT
SAUDI ARABIA
owner: consultant:
contractor:
ERECTION COMPLETION CERTIFICATE
The erection of the System/Subsystem package has been completed within the boundaries or terminal points specified.
.
Title
AIR COMPRESSOR FOR INSTRUMENT
BOUNDARIES OR TERMINAL
Refer to marked-up Drawing in Subsection 1.2
SUPPORTING DOCUMENTATION
Refer to Section 4.0 for the related documentation
Notice is hereby given to all parties that from 16:00 hours on 9/04/2012 Initial startup activities to commence on this equipment. The System/Subs
您可能关注的文档
- (学英语最基本的单词!) General Service List.docx
- 06年PL Checklist(中文版).ppt
- 09 spare parts list.pdf
- 11Political considerations in the decision of Chinese SOEs to list in HK_JAE_2012.pdf
- 18.IBM全球数据中心调研-高效运营最佳实践.docx
- 1VC常用控件介绍.doc
- 1d) PSCI Checklist for HK Reg Ships (7 June 2011).doc
- 2. Definitions and Notation 3. The List of Geometries Acknowledgement.pdf
- 2 List of Figures.pdf
- 2.增收节支具体措施和要求.docx
最近下载
- 矩阵分析在通信领域的应用论文.docx VIP
- AAC板材施工方案.docx VIP
- JTT1495-2024公路水运危险性较大工程安全专项施工方案审查规程.pdf VIP
- 地方建筑图集 甘肃甘12G2填充墙与柱、剪力墙及梁板构造.docx VIP
- 2025年6月浙江省普通高校招生选考科目考试化学试题与答案.docx VIP
- 郑州市2026届高三(二模)化学试卷(含答案).pdf
- 智能机器人技术--巡检机器人.pptx VIP
- 大学本科《社会主义发展史》课程期末考试试题库完整版2024.docx VIP
- 2020年印尼劳工法-(中文版).pdf VIP
- 丙烯酸乙酯-国际化学品安全卡.pdf VIP
原创力文档

文档评论(0)