Short-term multi-objective optimization scheduling for cascaded hydroelectric plants with dynamic generation flow limit based on EMA and DEA》.pdfVIP

  • 13
  • 0
  • 约8.91万字
  • 约 9页
  • 2015-11-22 发布于河南
  • 举报

Short-term multi-objective optimization scheduling for cascaded hydroelectric plants with dynamic generation flow limit based on EMA and DEA》.pdf

Short-term multi-objective optimization scheduling for cascaded hydroelectric plants with dynamic generation flow limit based on EMA and DEA》.pdf

Electrical Power and Energy Systems 57 (2014) 189–197 Contents lists available at ScienceDirect Electrical Power and Energy Systems journal homepage: www.else /locate/ijepes Short-term multi-objective optimization scheduling for cascaded hydroelectric plants with dynamic generation flow limit based on EMA and DEA Wu Jiekang a,⇑, Guo Zhuangzhi a, Wu Fan b a School of Automation, G

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档