- 5
- 0
- 约14.32万字
- 约 10页
- 2015-11-22 发布于河南
- 举报
Int. J. Production Economics 168 (2015) 81–90
Contents lists available at ScienceDirect
Int. J. Production Economics
journal homepage: /locate/ijpe
Some due date determination scheduling problems with two agents
on a single machine
Du-Juan Wang a, Yunqiang Yin b, Jianyou Xu c, Wen-Hsiang Wu d, Shuenn-Ren Cheng e,n,
Chin-Chia Wu f
a School of Manageme
您可能关注的文档
- Software architecture review by association》.pdf
- Software as a Service Value and Firm Performance - A literature Review Synthesis in Small and Medium Enterprises》.pdf
- Software chrestomathies》.pdf
- Software clone detection A systematic review》.pdf
- Software Component Clustering and Classification Using Novel Similarity Measure》.pdf
- Software contributions to aircraft adverse events Case studies and analyses of recurrent accident patterns and failure mechanisms》.pdf
- Software control flow error detection and correlation with system performance deviation》.pdf
- Software defect prediction using a cost sensitive decision forest and voting, and a potential solution to the class imbalance problem》.pdf
- Software defect prediction using cost-sensitive neural network》.pdf
- Software defect prediction using ensemble learning on selected features》.pdf
最近下载
- 包头市城市配电网“十二五”规划设计方案-baotou city power distribution network.docx VIP
- 体育场馆照明设计及检测标准.docx VIP
- 第九届哈佛大学-麻省理工数学竞赛代数题及解答.pdf
- FANUC刀纹调试案例.pptx
- 2025年上海市16区语文中考一模汇编 专题03文言文对比阅读(纯文言篇,模考真题22篇)含详解.docx VIP
- 合肥城市配电网“十二五”规划j.doc VIP
- 数控技术期末考试试题.pdf VIP
- 初中历史新课程标准(2025年修订版) .pdf VIP
- 《压缩机电气控制内部培训稿》.ppt VIP
- 农村订单定向免费医学生资格申报表.doc VIP
原创力文档

文档评论(0)