SignificantNRCEnforcementActionsDataset.xlsVIP

  1. 1、本文档共24页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
SignificantNRCEnforcementActionsDataset.xls

Sheet5 Sheet4 Sheet3 Sheet2 Sheet1 Action Number Summary Reactor EA-10-257 Issue Date On January 31, 2011, the NRC issued a Notice of Violation to Carolina Power and Light Company for two violations associated with two White Significance Determination Process findings.? The first violation involved the failure to adequately implement requirements, as required by Technical Specifications 5.8.1, “Procedures,” of multiple procedures during an uncontrolled cooldown of the Reactor Coolant System (RCS) and subsequent safety injection.? Specifically, on March 28, 2010, following a reactor trip, the licensee: (1) failed to take required procedural actions to stop an uncontrolled cooldown that resulted in a safety injection; (2) failed to identify a loss of component cooling water flow to the thermal barrier heat exchangers coincident with a failure to identify a loss of charging pump suction that resulted in inadequate seal injection flow; (3) re-energized electrically faulted equipment that damaged surrounding equipment and resulted in electrical ground alarms, which required an Alert emergency declaration. ?The second violation involved failure to adequately design and implement operator training based on learning objectives as required by 10 CFR 55.59(c)4.? Specifically, prior to March 28, 2010, training lesson material failed to identify the basis of a procedural action involving reactor coolant pump seal cooling, as required by a systems approach to training, as defined in 10 CFR 55.4. Type Carolina Power and Light Company (H.B. Robinson Steam Electric Plant) EA-11-014 Exelon Generation Company, LLC (Byron Station Unit 2) On March 14, 2011, the NRC issued a violation of 10 CFR Part 50, Appendix B, Criterion V, associated with a White Significance Determination Process finding involving the failure to provide appropriate quantitative or qualitative acceptance criteria related to maintenance on the 2A emergency diesel generator.? Specifically, on January 17

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档