SECTION2-CityofVancouver.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
SECTION2-CityofVancouver.doc

SECTION 2 WATER DESIGN AND CONSTRUCTION REQUIREMENTS Page 2-1 DESIGN REQUIREMENTS 2-1.01 Introduction 2-3 2-1.02 Distribution System Extensions to Support Development 2-3 2-1.03 Connection to Existing System 2-3 2-1.04 Water Main Locations; Easements 2-4 2-1.05 System Reliability; Looping 2-4 2-1.06 Water Pipe Materials and Size 2-5 2-1.07 Depth of Cover 2-6 2-1.08 Coordination with Other Utilities; Water Main Profiles 2-6 2-1.09 Air Release, Vacuum Release and Blow-off Valves 2-6 2-1.10 Isolation Valves 2-7 2-1.11 Thrust Blocks and Restrained Joints 2-7 2-1.12 Deflection at Pipe Joints 2-7 2-1.13 Cross-connection Control 2-8 2-1.14 Water Demand vs. Meter Size 2-8 2-1.15 WSDOT/Railroad Crossings 2-8 2-1.16 Fire Hydrant Spacing Requirements 2-8 2-1.17 Resources 2-9 2-2 CONSTRUCTION REQUIREMENTS 2-2.01 General 2-10 2-2.02 Ductile Iron Pipe 2-10 2-2.03 Ductile Iron Fittings 2-10 2-2.04 Restrained Push-On Joints 2-10 2-2.05 Restrained Mechanical Joint 2-11 2-2.06 Valves 2-11 2-2.07 Valve Boxes 2-11 2-2.08 Standard Air Release Valves 2-12 2-2.09 Standard Blowoff Assemblies 2-12 2-2.10 Tapping Sleeves 2-12 2-2.11 Tapping Valves 2-12 2-2.12 Standard Fire Hydrant Assembly 2-13 2-2.13 Trench Excavation, Bedding and Backfill 2-13 2-2.14 Compaction of Backfill 2-14 2-2.15 Cutting and Plugging Existing Pipe 2-14 2-2.16 Water Services 2-15 2-2.17 Relocating Existing Water Services 2-15 2-2.18 Abandoning Water Services 2-15 2-2.19 Hydrostatic Testing 2-15 2-2.20 Disinfecting Water Mains 2-15 2-2.21 Connection to Existing System 2-15 2-3 WATER STANDARD PLAN DETAIL SHEETS 2-17 W-1 to

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档